
Public Works Minister Kamel Nasri called on Tuesday in El-Bayadh to prepare a “comprehensive and accurate” study to eliminate the congestion points and interruptions in traffic on National Road No. 47 at the southeastern exit of the province capital.
On the second and last day of a working visit to the province, the minister highlighted that this slope, which is known to be difficult during snowfalls and weather fluctuations periods that usually lead to the accumulation of torrents, calls for taking all urgent measures to prepare a comprehensive and accurate study and find appropriate solutions.
The program of the second day of a working and inspection visit by the Minister of Public Works Kamel Naseri to the wilaya of El Bayadh includes a preview of the rehabilitation works of a section of National Road No. 47 between El-Bayadh and Aflou district in Laghouat at a distance of 30 km.